Contact Us 389/3RT, Road Number 3, Axis Bank Lane, Ameerpet, Hyderabad.
Call Us 040 44720215
Mail Us info@sriinfotech.co.in
Consultancy Services for Road Safety Consultants for Development, Construction & Maintenance Stage Safety Audit services for Package-I: 6- laning of (i) Kerala/Karnataka (Thalappady) to Chengala, (ii) Chengala to Neeleshwaram, (iii) Neeleshwaram to Thaliparambha and (iv) Thaliparambha to Muzhapilangad of NH-66 on Hybrid Annuity Mode under Bharatmala Pariyojana – PIU-Kozhikode. Total Length of Projects :146.33 Kms, Client: NHAI
Consultancy Services for Road Safety Consultants for Development, Construction & Maintenance Stage Safety Audit services for Package-II: 6- laning of (I) Azhiyur to Vengalam (Except Pallid to Moorad section), (ii) Kozhikode Bypass, (iii) Ramanattukara to Valanchery Bypass and (iv) Valanchery Bypass to Kappirikkad of NH-66 on Hybrid Annuity Mode under Bharatmala Pariyojana-PIU-Kozhikode & PIU-Cochin. Total Length of Projects: 146.23 Kms, Client: NHAI
Consultancy Services for Road Safety Consultants for Development, Construction & Maintenance Stage Safety Audit services for Package-I of (I) Bangalore-Chennai Expressway (Phase-II/Package-I) (ii) Bangalore-Chennai Expressway (Phase-II/Package-II) (iii) Bangalore- Chennai Expressway (Phase-II/Package-III) in State of Andhra Pradesh. Total Length of Projects: 85 Kms. Client: NHAI
Consultancy Services for Road Safety Consultants for Development, Construction & Maintenance Stage Safety Audit services for Package-II of 6-laning of (I) Chittor-Thatchur Section of NH-716B (Package-I) (ii) Chittor-Thatchur Section of NH-716B (Package-II) (iii) Chittor-Thatchur Section of NH-716B (Package-III) (iv) Chittor-Thatchur Section of NH-716B (Package-IV) in State of Andhra Pradesh. Total Length of Projects: 116.10 Kms, Client: NHAI
Consultancy Services for “Appointment of Road Safety Auditors/ Consultant for Conducting Road safety audit, detailed survey, investigation, preparation of DPR, RFP documents/cost estimate/BOQ for long term measures including submission of short-term measures at identified Black spots on National Highways under the jurisdiction of Regional Office-Kerala-Package-I (33 Nos Blackspots)”; Client: NHAI
Consultancy Services for “Appointment of Road Safety Auditors/ Consultant for Conducting Road safety audit, detailed survey, investigation, preparation of DPR, RFP documents/cost estimate/BOQ for long term measures including submission of short-term measures at identified Black spots on National Highways under the jurisdiction of Regional Office-Kerala-Package-II (32 Nos Blackspots)”; Client: NHAI
Road Safety Audit during Design Stage of “Upgrading of Thuraiyur – Perambalur Section of SH-142 in the State of Tamilnadu under Chennai-Kanyakumari Industrial Corridor Project (CKICP), Client: DRSIPL-Sree Infratech JV. Authority: Chennai Kanyakumari Industrial Corridor Project (CKICP). Authority-Highways Dept., Govt. of Tamilnadu), Length: 30.057 Kms.
Road Safety Audit for Balance works of Rehabilitation and Upgradation of Nakrekal to Nagarjunasagar Section to 2L+PS/4L from Km. 1.000 to Km. 86.057 of NH-565 in the State of Telangana on EPC mode. Client: R &B NH Circle, Hyderabad (Govt. of Telangana).
Pre - Opening Stage Road Safety Audit for balance works for the project of “Development of Outer Ring Road (ORR) Phase-I on Design, Build, Finance, Operate and Transfer (DBFOT) Annuity Basis at Chennai in the State of Tamil Nadu”. Client: GMR (Authority- TNRDC)
Pre-Opening Stage Road Safety Audit for “Improvements to the selected stretches of NH-716A from Km. 0.000 to Km. 40.200 of Puttur - Uttukottai Road in the state of Andhra Pradesh on EPC Mode. Client: M/s. JMC Constructions Pvt. Ltd. (Authority-R&B (NH Division), Govt. of AP). Length=40.200 Kms.
Road Safety Audit for 4-laning of Periya Shanti to Bantwal Section incl. 6 lane Flyover at Kalladka of NH-48 (new NH-75) in the State of Karnataka. Client: M/s KNR Construction, Authority-NHAI, Length=49 Kms.
Road Safety Audit for “Widening and Strengthening for improvement and upgradation of NH- 709A Garhmukteshwar (Chainage-83+200 of NH-24) to Meerut (Chainage 9+860 of NH-235) including connector to NH 119 Package XII in the State of Uttar Pradesh”. Client: M/s. TATA Projects Ltd. (TPL), Authority-NHAI, Length=50 Kms.
Road Safety Audit for NH-26 at selected stretches of Salur to Vizianagaram Section in the State of Andhra Pradesh. Client: M/s. RT ETI Environtech Pvt. Ltd. (Authority-R&B, NH Division, Govt. of Andhra Pradesh)
Road Safety Audit for NH-766 at selected stretches of Hyderabad - Tokapelle Road – Srisailam Ghat Section in State of Telangana. Client: M/s. RT ETI Environtech Pvt. Ltd. (Authority-NH R&B Division, Govt. of Telangana)
Pre - Opening Stage Road Safety Audit for balance sections of 4- Laing of Kundapur to Karnataka/Kerala border of NH-66 in the State of Karnataka. Client: Navayuga Udupi Toll Way Private Limited. Authority-NHAI, Length 8.33 Kms.
Road Safety Audit for Construction of 4 lane divided carriageway missing link section of NH-39 (Rewa Bypass) from Junction with NH 30 near Bela to Junction with MPRDC Ring Road near Silpara on SH-9 under Bharatmala Pariyojana in the State of Madhya Pradesh on EPC Mode. Client: PRAVAS Engineering & Management Consultant Pvt. Ltd. Authority-NHAI. Length=13.100 Kms.
Road Safety Audit for Hyderabad – Karimnagar- Ramagundem Road (HKR) Project (SH-1) from Km. 28.200 to Km. 235.058 in State of Telangana under (PPP) on Design, Build, Finance, Operate & Transfer (DBFOT). Client: HKR Roadways Ltd. Authority-R&B, Govt. of Telangana.
Road Safety Audit (Pre-COD/Completion Stage) for 4 laning of Natham to Thuvarankurichi Section of NH-785E from Design Ch. 36+960 to 61+115(Design Length 24.425 Km) under Bharatmala Pariyojna Phase-I (Feeder Route Category) on EPC mode in the State of Tamilnadu. Client: RR Infra Constructions. Authority- NHAI
Road Safety Audit (Pre-COD) for “Rehabilitation & Up Gradation of Losari - Machavaram Section of NH-214A (New NH-216) to Two Lane with Paved Shoulder in the State of Andhra Pradesh Under NHDP Phase-IV”. Client: M/s. TATA Projects Ltd. (TPL), Authority-MORTH, Length=50 Kms.
Road Safety Audit (Pre-COD) for “Rehabilitation & Up Gradation of Dhindi-Digamarru Section of NH-214A (New NH-216) to Two Lane with Paved Shoulder in the State of Andhra Pradesh Under NHDP Phase-IV”. Client: M/s. TATA Projects Ltd. (TPL), Authority-MORTH, Length=42 Kms.
Road Safety Audit (Pre-COD) for “Rehabilitation & Up Gradation of Gurajanapalli -Polekuru Section of NH-214A (New NH-216) to Two Lane with Paved Shoulder in the State of Andhra Pradesh Under NHDP Phase-IV”. Client: M/s. TATA Projects Ltd. (TPL), Authority-MORTH, Length=53.9 Kms.
Pre-COD Stage Road Safety Audit of “Upgrading of Thuraiyur – Perambalur Section of SH- 142 in the State of Tamilnadu under Chennai-Kanyakumari Industrial Corridor Project (CKICP)”. Client: DRSIPL-Sree Infratech JV. Authority: Chennai Kanyakumari Industrial Corridor Project (CKICP), Highways Dept., Govt. of Tamilnadu), Length: 30.057 Kms
Pre-COD Stage Road Safety Audit of “Construction of Balance work for 4 laning of Raiganj- Dalkhola Section of NH-34 from Km 398.000 to 452.750(Package-V) in the State of West Bengal on EPC mode. Client: M/s. Dineshchandra R. Agarwal Infracon Pvt Ltd(DRA), Authority-NHAI, Length=54.75 Kms.
Road Safety Audit of “6 laning of Chandikhole-Jagatpur-Bhubaneshwar Section of NH-5 from Km 414.000 to Km 419.000 & Km 0.000 to Km 62+000 in the State of Odisha as BOT(Toll) on DBFO Pattern under NHDP Phase-V on Built Operate Transfer (BOT) Basis. Client: M/s. Shree Jagannath Expressways Private Limited (SJEPL)/Maple Highways, Authority-NHAI, Length=67 Kms.
Road Safety Consultant for “Construction of Flyover at Km 520.000 to Km 521.650 near BHEL Junction on Pune-Hyderabad Section of NH-65 under NH(O) on EPC mode in the State of Telangana. M/s. RRR Construction & Projects Pvt Ltd (RRR), Authority-R&B (NH Division), Govt of Telangana.
Pre-COD Stage Road Safety Audit of “Construction of 4-lane Vehicular Underpass (VUP)at Aler- Jeedikal Cross Road @Km 72+010 along with Slip/Service Road on Hyderabad-Warangal Section of NH-163 in the State of Telangana on EPC mode”. Client: M/s. Rockeira Engineering Pvt Ltd, Authority-NHAI.
Road Safety Audit for Construction of Proposed 2-lane ROB and its approaches in Lieu of existing Level Crossing No.119(LC-119) at Km 226/800 of NH-205(Km 52+688 of New NH-710 under Setu Bharatam in State of Andhra Pradesh Under NH(O) on EPC Mode. Client: Paramount Tradecom Pvt Ltd. Authority- R&B (NH Division), Govt of Telangana.
Road Safety Audit for Construction of Proposed 2-lane ROB and its approaches in Lieu of existing Level Crossing No.120(LC-120) at Km 56/700 of NH-18(New NH-40) under Setu Bharatam in State of Andhra Pradesh Under NH(O) on EPC Mode. Client: Paramount Tradecom Pvt Ltd. Authority- R&B (NH Division), Govt of Andhra Pradesh.